- $467,300
- 2Bd
- 3Ba
- 2,026 Sq Ft
SOLD

















Last sold 01/20/2021 for $475K
bed
bath
Sqft ($250/Sqft)
| Property type House | Neighborhood | HOA fee $0/month | Lot size 7,527 Sqft | Movoto estimate | Parking 2 garage spaces | Rental estimate |
| Overview | |
| Cooling/AC | Ceiling Fan(s), Central, Smart Vent |
| Heating | Central, Natural Gas, Smart Vent, Solar Heating |
| Levels/Style | 1, Cottage/Bungalow |
| SubType | Single Family Residence |
| SqFt | 1900 |
| Status | Closed |
| Type | Residential |
| Lot Size (Acres) | 0.1728 |
| Lot Size (SqFt) | 7527 |
| Interior | |
| # Full Baths | 2 |
| Bathrooms | Tub W/Shower Over |
| Primary Bathroom | Closet, Double Sinks, Shower Stall(s), Tile, Window |
| Total # of Bathrooms | 2 |
| Primary Bedroom | Walk-In Closet |
| Total # of Bedrooms | 2 |
| Kitchen | Stone Counter, Island, Pantry Closet, Built-In Electric Oven, Dishwasher, Gas Cook Top, Plumbed For Ice Maker, Tankless Water Heater |
| Laundry | Cabinets, Sink |
| Dining Room | Dining Bar, Dining/Family Combo |
| Other Room(s) | Baths Other, Den, Great Room, Master Bathroom, Master Bedroom |
| Flooring | Carpet, Laminate, Tile |
| Window Features | Low E Glass Full |
| Exterior | |
| Roof | Composition |
| Foundation | Slab |
| Construction | Frame, Lap Siding, Stone, Stucco |
| # Garage Spaces | 2 |
| Garage | Garage Door Opener, Garage Facing Front |
| Lot Desc | Auto Sprinkler Front, Gated Community, Landscape Front, Street Lights |
| Fencing | Back Yard |
| Amenities / Utilities | |
| Water | Meter On Site, Public |
| Utilities | All Public, Natural Gas Connected |
| Sewer/ Septic | In & Connected, Sewer In Street |
| Electricity | 220 Volts, 220 Volts In Laundry |
| HOA Amenities | Barbeque, Clubhouse, Dog Park, Exercise Room, Park, Pool, Recreation Facilities, Spa/Hot Tub |
| Pool | Lap, Pool/Spa Combo, Heated |
| Location | |
| Area | 20503 |
| County | San Joaquin |
| School County | San Joaquin |
| School 2 | Manteca Unified |
| School 3 | Manteca Unified |
| School 1 | Manteca Unified |
| APN | 218-220-13 |
| Zoning | Residential |
| Directions | From The Bay Area: Take Hwy 580 East To Hwy 205 East. Then Take Hwy 120 East Towards Manteca. Take The Hwy 99 North Exit And Then The Yosemite Ave Exit. Right On Cottage Ave And Then Left Onto E. Louise Ave. The Collective Will Be Located On Your Right Hand Side At The Roundabout. Venture Is The First Left As You Enter The Gated Community. |
| Lot/ Land Details | |
| Road Description | Paved |
| Road Responsibility | Private Maintained Road |
MLS # 20044585| Est. value | Bed/bath | Sqft | mi | |
|---|---|---|---|---|
| 965 Camborne Dr, Manteca, CA 95336 | $538,200 | 2/2 | 1,826 | 0.01 |
| 957 Camborne Dr, Manteca, CA 95336 | $501,200 | 2/2 | 1,513 | 0.01 |
| 962 Camborne Dr, Manteca, CA 95336 | $514,700 | 2/2 | 1,639 | 0.02 |
| 976 Camborne Dr, Manteca, CA 95336 | $540,600 | 2/2 | 1,826 | 0.02 |
| 983 Camborne Dr, Manteca, CA 95336 | $553,200 | 2/2 | 2,026 | 0.02 |
| 949 Camborne Dr, Manteca, CA 95336 | $555,900 | 2/2 | 2,144 | 0.02 |
| 954 Camborne Dr, Manteca, CA 95336 | $584,700 | 2/2 | 2,144 | 0.02 |
| 980 Camborne Dr, Manteca, CA 95336 | $554,900 | 2/2 | 2,026 | 0.02 |
Estimated values are based on public record data and automated valuation models. Values are not guaranteed and may not reflect current market conditions.
$655,425
$495,000
$445,000
$726,990
$720,952
$499,000
$570,000
$496,950
$472,100
$501,950
$571,500
$469,500
$546,495
$469,950
$349,900
$479,500
$427,500
$400,000
$420,000
$619,190
$525,000
$634,975
$410,000
$556,975
$412,000
$203,500
$562,500
$759,000
$429,700
$924,500