- $650,000
- 3Bd
- 2Ba
- 1,772 Sq Ft
SOLD







































































Last sold 01/31/2024 for $805K
bed
bath
Sqft ($250/Sqft)
| Property type House | Neighborhood | Year built 2001 | HOA fee $0/month | Lot size 2.32 Acre | Movoto estimate | Parking 4 garage spaces |
| Overview | |
| Cooling/AC | Heat Pump |
| Heating | Forced Air, Pellet Stove, Propane |
| Levels/Style | Two, Northwest |
| MLS # | 220169991 |
| Virtual Tour | N/A |
| SubType | Single Family Residence |
| SqFt | 3224 |
| Status | Closed |
| Lot Size (Acres) | 2.32 |
| Lot Size (SqFt) | 101059.2 |
| Property Tax | 4621.2 |
| Builder Name | Patrick/ Walters |
| Year Built | 2001 |
| Interior | |
| Total # of Bathrooms | 3 |
| # of Full Baths | 3 |
| Total # of Bedrooms | 5 |
| Flooring | Carpet, Hardwood, Laminate |
| Interior Features | Breakfast Bar, Built-in Features, Ceiling Fan(s), Double Vanity, Dual Flush Toilet(s), Granite Counters, Kitchen Island, Linen Closet, Open Floorplan, Pantry, Primary Downstairs, Soaking Tub, Tile Shower, Vaulted Ceiling(s), Walk-In Closet(s) |
| Appliances | Cooktop, Dishwasher, Disposal, Dryer, Microwave, Oven, Refrigerator, Washer, Water Heater |
| Exterior | |
| Roof | Metal |
| Foundation | Stemwall |
| Construction | Frame |
| Parking | Attached, Driveway, Garage Door Opener, Gated, Gravel, RV Access/Parking |
| Other Structures | Second Garage, Shed(s) |
| Exterior Features | Built-in Barbecue, Fire Pit |
| Amenities / Utilities | |
| Water Source | Private, Well |
| Security Features | Carbon Monoxide Detector(s), Smoke Detector(s) |
| Location | |
| View | Pond, Territorial |
| Subdivision | Alpine Meadows |
| Elementary School | LaPine Elem |
| Middle School | LaPine Middle |
| High School | LaPine Sr High |
| APN | 145260 |
| Zoning | RR10. WA |
| Directions | From Burgess, North On Meadow. Rt On Alpine Property Is At The Corner Of Alpine And Sundown. From Day Rd East On Alpine To The Corner Of Alpine And Sundown. Gated Property. |
| Lot/ Land Details | |
| Road Frontage | Private Access |
| Lot Features | Fenced, Landscaped, Level, Sprinkler Timer(s), Sprinklers In Front, Sprinklers In Rear, Water Feature |
| Road Surface | Paved, Other |
MLS # 220169991| Est. value | Bed/bath | Sqft | mi | |
|---|---|---|---|---|
| 16288 Dyke Rd, La Pine, OR 97739 | $375,600 | 2/1 | 784 | 0.05 |
| 52938 Sundown Dr, La Pine, OR 97739 | $743,700 | 4/3 | 3,528 | 0.06 |
| 16274 Dyke Rd, La Pine, OR 97739 | $255,000 | 3/2 | 1,188 | 0.08 |
| 16268 Dyke Rd, La Pine, OR 97739 | $263,700 | 2/2 | 1,248 | 0.08 |
| 16310 Dyke Rd, La Pine, OR 97739 | $259,700 | 2/1 | 1,632 | 0.08 |
| 16257 Alpine Dr, La Pine, OR 97739 | $373,600 | 2/2 | 1,188 | 0.08 |
| 16260 Dyke Rd, La Pine, OR 97739 | $248,500 | 2/2 | 1,248 | 0.1 |
| 16332 Dyke Rd, La Pine, OR 97739 | $322,600 | 2/1 | 938 | 0.1 |
Estimated values are based on public record data and automated valuation models. Values are not guaranteed and may not reflect current market conditions.
$735,000
$174,980
$745,000
$224,500
$305,000
$749,000
$784,400
$609,900
$277,000
$275,000
$27,500
$79,999
$642,900
$1,600,000
$825,000
$795,000
$1,209,900
$612,000
$719,000
$630,000
$699,000
$937,500