Movoto Real Estate
Sold on 06/11/2026
  • Exterior
  • Floorplan
  • View/Area
  • Other
  • Kitchen
  • Bedroom
  • Bath
  • Living
  • Entry Way
  • Dining

4 Westlake Pointe Dr, Pinehurst, NC 28374

$1,050,000

Last sold 06/11/2026 after 72 Days

  • 3

    bed

  • 3

    bath

  • 2,636

    Sqft ($398/Sqft)

House not for sale

About 4 Westlake Pointe Dr

Property type House
Year built 1988
HOA fee $220/month
Lot size 0.27 Acre
Movoto estimate
Parking 2 garage spaces
Rental estimate
Property description
LAKE FRONT PINEHURST. In Pinehurst, life is meant to feel a little different. Mornings begin slower. Afternoons stretch a little longer. Evenings settle in with views of the water and the quiet rhythm of a place designed for enjoyment, not urgency. This is not just a home--it's a retreat. A place where weekends feel like getaways, and everyday living carries the ease of a resort experience. For those who come to Pinehurst for golf, for relaxation, for connection--this is where that lifestyle continues long after the round is over. There is a certain rhythm to life on Lake Pinehurst-- not the kind that increases anxiety to get out the door rushing to tackle the day; but rather, one that begins quietly, with light stretching across the water as the sun rises just beyond your window. Mornings here are unhurried. Coffee lingers longer. The world feels still, save for the occasional ripple across the lake, '’sea-smoke'' swirling off the surface at the sun's awakening, luring you to slow down and take your coffee out to the low maintenance Trex dock to look for Blue Herons in the summer and Buffleheads in winter. From the moment you step onto the wraparound Trex deck, the day becomes yours to design. Sun or shade is simply a matter of where you choose to sit--under the canopy of a mature tree or stretched out in the warmth, overlooking deep water below. The upscale cable railing makes viewing the lake easy from all vantage points. The lake invites you in, whether for a quiet paddle at dawn, an afternoon swim from your private dock, some fishing after work, or an impromptu raft-up with friends as the sun begins its descent. One can find both solitude and peace as well as social gatherings on the lake such as raft-ups, bonfires, or fishing and sailing clubs. Let the lake melt away the stress of your life. This is not just a beautifully renovated 3 bedroom 21/2 bath house--this is Lake Pinehurst living, Lakefront homes with private docks on Lake Pinehurst are rarely available--especially with deep water, privacy, and a golf cart ride to Pinehurst Country Club. This beautifully renovated 3-bedroom, 2.5-bath home offers a unique opportunity to enjoy both lake and golf lifestyles in one setting. The main level is designed around the view, with a vaulted smooth ceiling living room, and wood-burning fireplace. The rennovated open concept kitchen with custom quartz counters pairs beautifully with the dining area, all with views of the water. Modern beige neutrals and engineered wood flooring add warmth and detail throughout. The primary suite on the main floor offers a relaxing retreat under a concealed fan, and a steam shower and towel warmer in the bathroom. Upstairs, a loft with closet provides flexible space for an office, library, or additional living area. The walk-out lower level includes two bedrooms, a full bath, and a spacious recreation room with low-maintenance LVP flooring. Outdoor living is the highlight, with wraparound Trex decking and cable railing for upscale and unobstructed views, offering both sun and shade throughout the day. For total relaxation, a saltwater therapeutic hot tub overlooks the lake, and the private dock provides deep water suitable for boating and swimming. All great for entertaining guests of all ages. Additional features include a 2-car garage with epoxy flooring, mini-split HVAC for year-round comfort, wired for 220, plumbed and vented (originally for a pottery kiln, but could be change to a mainlevel laundryroom or Ev charging. Kiln and kiln cabinet does not convey). Lake Pinehurst is a private freshwater lake offering boating, fishing, kayaking, and paddleboarding, along with access to marina and beach club amenities with Pinehurst CC membership, with is transferrable with this home.. HOA dues cover exterior yard maintenance including mowing, pine needles, mulch, pruning small trees and shrubs, and irrigation--supporting a low-maintenance, lock-and-leave lifestyle.
Listed by
Listing Agent - Sarah Casey
Listing Agent Contact: 888-584-9431
Listing Office - eXp Realty
Source: Hive MLS mls logo
MLS#100563990 • last updated 5 months ago
Movoto checked Hive MLS for data 12 minutes ago
Overview
Cooling/AC Central Air, Zoned, Heat Pump, Multi Units
Heating Wood, Heat Pump, Fireplace(s), Electric
Levels/Style Three Or More, Patio, Chalet, Patio, Wood Frame, Stick Built
MLS # 100563990
Virtual Tour N/A
SubType Single Family Residence
Living Area 2636
Status Closed
Lot Size (Acres) 0.27
Lot Size (SqFt) 11674
HOA Westlake Pointe HOA
HOA Fee 2640
Year Built 1988
Interior
Total # of Bathrooms 3
# of Full Baths 2
# of Half Baths 1
Total # of Bedrooms 3
Total # of Rooms 9
Laundry In Basement, Laundry Room, Utility Sink
Flooring LVT/LVP, Tile, Wood, Hardwood
Interior Features Master Downstairs, Walk-in Closet(s), Vaulted Ceiling(s), High Ceilings, Entrance Foyer, Solid Surface, Kitchen Island, Ceiling Fan(s), Hot Tub, Walk-in Shower, Eat-in Kitchen, Walk-In Closet(s)
Appliances Vented Exhaust Fan, Built-In Microwave, Washer, Self Cleaning Oven, Refrigerator, Range, Ice Maker, Dryer, Dishwasher, Electric Range
Accessibility Features None
Exterior
Roof Architectural Shingle
Foundation Block, Slab
Construction Fiber Cement, Wood Frame
# of Parking Spaces 2
Parking Workshop In Garage, Garage Faces Front, Concrete, Garage Door Opener, Lighted, On Site
Patio/Porch Open, Deck, Patio, Porch, Wrap Around, Balcony, Rear Porch, Side Porch
Fencing None
Exterior Features Irrigation System, Cluster Mailboxes, Garden, Outdoor Grill
Lot Features See Remarks, Boat Slip, Boat Dock, Bulkhead, Cove, Deeded Water Access, Deeded Waterfront, Navigable Water, Pier, Water Depth 4+, Landscaped, Sprinklers In Front, Sprinklers In Rear
Amenities / Utilities
Water Source Community Water, County Water
HOA Amenities Waterfront Community, Maintenance Grounds, Cable TV, Private Golf Carts Allowed
Security Features Security System, Smoke Detector(s)
Location
View Lake, Water
Waterfront Pier, Bulkhead, Cove, Deeded Water Access, Deeded Waterfront, Water Depth 4+
Subdivision Westlake Pointe
Elementary School Pinehurst Elementary
Middle School Southern Middle
High School District Moore County Schools
High School Pinecrest High
APN 46637
Zoning R10
Directions Rt 5 To Linden (right) To Pine Vista (left) To Burning Tree (right) To Westlake Point.e
Multifamily Details
Lot/ Land Details
Frontage Lakefront
Road Frontage City Street, State Road, Paved
Road Surface Paved
$1.01M
Range: $952K-$1.08M
Last 30 days 
Rental est.: $4,167/month
Gross rent multiplier: 21.0
  • Jun 2026
    mls logo MLS # 100563990
  • Jun 11, 2026 Sold
    $1,050,000
  • May 16, 2026 Pending
    —
  • Apr 21, 2026 Price Change
    $1,050,000 (-8.7%)
  • Mar 31, 2026 Listed
    $1,150,000
  • Nov 2025
    mls logo MLS # 100531476
  • Nov 6, 2025 Canceled
    —
  • Oct 11, 2025 Price Change
    $1,149,999 (-4.2%)
  • Sep 19, 2025 Listed
    $1,199,999 (+135.3%)
  • Jun 2020
    mls logo MLS # 199096
  • Jun 26, 2020 Sold
    $510,000
  • Jun 26, 2020 Sold
    $510,000
  • Mar 4, 2020 Listed
    $510,000
  • Mar 4, 2020 Listed
    $510,000 (+35.3%)
  • Jun 2020
    mls logo MLS # LP628189
  • Jun 25, 2020 Sold
    $510,000
  • Mar 4, 2020 Listed
    $510,000 (+2.3%)
  • Jun 2020
    mls logo MLS # 628189
  • Jun 25, 2020 Sold
    $510,000
  • Jun 8, 2020 Pending
    —
  • May 25, 2020 Active
    —
  • May 1, 2020 Price Change
    $510,000 (-3.8%)
  • Apr 10, 2020 Listed
    $530,000 (-3.6%)
  • Mar 7, 2020 Active
    —
  • Mar 7, 2020 Price Change
    $550,000 (+7.8%)
  • Mar 4, 2020 Listed
    $498,500 (-2.3%)
  • Jun 2017
    mls logo MLS # 178903
  • Jun 7, 2017 Sold
    $377,000
  • Jun 7, 2017 Sold
    $377,000 (-4.3%)
  • Nov 14, 2016 Listed
    $394,000
  • Nov 14, 2016 Listed
    $394,000 (+7.9%)
  • Jun 2017
    Public Records
  • Jun 7, 2017 Sold
    $377,000
  • Jun 2014
    mls logo MLS # 157414
  • Jun 9, 2014 Sold
    $365,000
  • May 27, 2014 Sold
    $365,000 (-11.0%)
  • Jan 17, 2014 Listed
    $410,000
  • Jan 16, 2014 Listed
    $410,000
  • Jun 2014
    Public Records
  • Jun 6, 2014 Sold
    $365,000
  • Year Property taxes Tax assessment
  • 2025
    $3,045 -2.6%
    $546,210
  • 2024
    $3,127 -4.2%
    $546,210
  • 2023
    $3,264 +4.8%
    $546,210 +46.43%
  • 2022
    $3,115 +4.1%
    $373,010 +7.81%
  • 2021
    $2,993 +3.1%
    $345,990
  • 2020
    $2,903 -1.3%
    $345,990
  • 2019
    $2,941
    $345,990
  • 4 Westlake Pointe Dr
    $1.05M
  • —
  • 28374
    $699K +16% y/y
  • Pinehurst
    $699K +16% y/y
No chart available
Statistics calculated by Movoto

Estimated values are based on public record data and automated valuation models. Values are not guaranteed and may not reflect current market conditions.

Thinking of selling? Get a Cash Offer.

  • A smooth, fast sale
  • Skip staging and repairs
  • No strings attached
10/10
7/10
5/10
Source: GreatSchools.org © 2026. All rights reserved.

Around the neighborhood

Explore everything this neighborhood has to offer.
By entering my info and clicking Ask a Question, I am providing my e-signature and express written consent to receive marketing emails, calls, and texts (including via automatic telephone dialing systems, AI generative, artificial or pre-recorded voice technology) relating to my inquiry from Movoto (and parties calling/messaging on their behalf) even if my number appears on the company, state, or national Do Not Call Registry. You also agree to ourTerms and Conditions and Privacy Policy. Consent not required to receive services (call 1-844-420-1270 to be connected without providing consent).

Nearby recently sold homes in Pinehurst, NC

Nearby homes for sale in Pinehurst, NC

Newest listings in 28374

  • Real Estate
  • NC
  • Moore County
  • Pinehurst
  • 28374
  • 4 Westlake Pointe Dr
Meet with a real estate agent today (844) 430-0869
The multiple listing information is provided by North Carolina Regional MLS. IDX information is provided exclusively for consumers’ personal, non-commercial use and that it may not be used for any purpose other than to identify prospective properties consumers may be interested in purchasing. Information deemed reliable but not guaranteed to be accurate. Buyer to verify all information. The information provided is for consumers' personal, non-commercial use and may not be used for any purpose other than to identify prospective properties consumers may be interested in purchasing. Listing information updated every 15 minutes. Terms of use & Privacy Policy, California Privacy Info. Copyright © 2005 - 2026 Movoto, Inc. All rights reserved. Equal Housing Opportunity CalDRE CalDRE #01517281
Movoto Real Estate is committed to ensuring accessibility for individuals with disabilities. We are continuously working to improve the accessibility of our web experience for everyone. We welcome feedback and accommodation requests, please submit them here.
The data relating to real estate on this web site comes in part from the Internet Data Exchange program of Hive MLS, and is updated as of 11/12/2026/7 AM. All information is deemed reliable but not guaranteed and should be independently verified. All properties are subject to prior sale, change, or withdrawal. Neither listing broker(s) nor Movoto shall be responsible for any typographical errors, misinformation, or misprints, and shall be held totally harmless from any damages arising from reliance upon these data. © 2026 Hive MLS
Requests for information regarding mortgage products will be directed to Movoto.com affiliate, Lower, LLC - a licensed Mortgage Lender (NMLS #1124061), or, based on your location, may be redirected to a participating mortgage marketing partner that may pay Lower, LLC for any consumer contact information provided through this site.