- $774,900
- 4Bd
- 4Ba
- 3,876 Sq Ft






















































































bed
bath
Sqft ($179/Sqft)
| Property type House | Neighborhood | Year built 2006 | HOA fee $0/month | Lot size 11.5 Acre | Parking 3 garage spaces |
| Overview | |
| Cooling/AC | Central Air |
| Heating | ForcedAir, Gas |
| Virtual Tour | External Link |
| MLS # | 3589642 |
| Living Area | 3848 |
| SubType | Detached |
| Type | Residential |
| Status | Active |
| Virtualtoururlunbranded2 | Https://iplayerhd.com/player/d9ee8b3a-4354-4f9a-abf1-ea3d0b1b63bb |
| Lot Size (Acres) | 11.5 |
| Property Tax | 4436.95 |
| Year Built | 2006 |
| Interior | |
| Total # of Bathrooms | 6 |
| # Full Bath | 5 |
| # Half Bath | 1 |
| # Bedrooms | 6 |
| Basement | Finished |
| Appliances | Dryer, Dishwasher, Disposal, Microwave, Range, Refrigerator, Stove, Washer |
| Interior Features | Attic, Fireplace, CableTv |
| Fireplace | None |
| Exterior | |
| Foundation | Poured |
| Roof | Architectural, Shingle |
| Construction | Fiber Cement |
| Parking Desc | Attached, Garage, ParkingPad |
| # Garage Spaces | 3 |
| Exterior Features | Deck, Garden, GravelDriveway, HotTubSpa |
| Patio/ Porch | Deck, Open, Screened |
| Lot Desc | Acreage, OutsideCityLimits, OpenLot, Wooded |
| Lot Size Dimensions | Irregular |
| Amenities / Utilities | |
| Sewer/ Septic | Septic Tank |
| Water Source | Private, Well |
| HOA Fee Includes | None |
| Location | |
| County | Miller |
| Subdivision | Eagle Mountain |
| Elem School District | School Of The Osage |
| Middle School District | School Of The Osage |
| High School District | School Of The Osage |
| APN | 122009000000003056 |
| Zoning | Residential |
| Directions | Go Hwy 54 West Approximately 3 Miles From Intersection Of W And 54 Make A Right On Allen, Take Catrock, Right On Aztec Stay Right At The "Y" Road Will Turn Into Keigan. |
| Lot/ Land Details | |
| Road Surface | Asphalt, Paved |
$204,500
$374,950
$399,999
$249,900
$125,000
$154,900
$187,000
$399,000
$199,000
$175,000
$324,950
$399,900
$324,900
$399,999
$187,000
$174,108
$225,000
$189,000
$325,000
$179,800
$85,000
$284,900
$215,000
$315,000
$454,900
$209,900
$299,900