- $499,900
- 3Bd
- 4Ba
- 2,494 Sq Ft
$25K


















































bed
bath
Sqft ($228/Sqft)
| Property type House | Neighborhood | Year built 1957 | HOA fee $0/month | Lot size 0.76 Acre | Parking 3 garage spaces |
| Overview | |
| Cooling/AC | Ceiling Fans, Central Air |
| Heating | Forced Air, Gas |
| Levels/Style | One, Ranch |
| Type | Residential |
| MLS # | 1893260 |
| Status | Active |
| SubType | Single Family Residence |
| SqFt | 2599 |
| Lot Size (SqFt) | 33193 |
| Lot Size (Acres) | 0.762 |
| Year Built | 1957 |
| Interior | |
| Total # of Bathrooms | 3 |
| # of Full Baths | 2 |
| # of Half Baths | 1 |
| Total # of Bedrooms | 4 |
| Living Room | 13x30 Level: 1, Fireplace, Walkout, Laminate Floor |
| Dining Room | Window Treatment, 9x8 Level: 1 |
| Basement | Full, Finished - Full, Walkout |
| Family Room | 20x11 Level: Basement, Walkout, Laminate Floor |
| Breakfast Room | 3x7 Level: 1 |
| Total # of Rooms | 8 |
| Entry | Tile Floor, 10x5 Level: 1 |
| Kitchen | Marble/Granite/Slate, Counter Bar, Eat-In, Solid Surface Ctr, Gourmet, Window Treatment, Wood Cabinets |
| Appliances | Microwave, Dishwasher, Refrigerator, Trash Compactor, Garbage Disposal, Gas Cooktop |
| Window Features | Double Hung, Vinyl |
| Interior Features | 9Ft + Ceiling, Beam Ceiling, Multi Panel Doors, Natural Woodwork, Crown Molding, Skylight(s), Vaulted Ceiling |
| Fireplace | Stone, Wood |
| Accessability Features | No |
| Exterior | |
| Foundation | Block |
| Roof | Shingle |
| Construction | Brick |
| Parking | Built In, Oversized, Garage Attached, Driveway |
| # Garage Spaces | 3 |
| Exterior Features | Fireplace, Yard Lights |
| Fencing | Metal |
| Other Structures | Shed, Workshop |
| Patio/ Porch | Deck |
| Lot Desc | Wooded |
| Amenities / Utilities | |
| Water Heater | Gas |
| Sewer/ Septic | Public Sewer, Grinder Pump |
| Gas | Natural |
| Water Source | At Street |
| Miscellaneous | Attic Storage |
| Pool | In-Ground, Vinyl |
| Smart Technology | Appliances, Lighting, Doors/Locks, Security, HVAC, Thermostat |
| Security Features | Security System, Smoke Detector(s) |
| Location | |
| View | Woods |
| County | Hamilton |
| Area | Hamilton-E07 |
| High School District | Forest Hills Local S |
| APN | 500-0213-0310-00 |
| Multifamily Details |
| Lot/ Land Details | |
| Land Desc | 0.5 To 0.9 Acres |
$275,000
$460,000
$396,900
$409,900
$379,900
$293,900
$554,500
$282,000
$440,950
$430,000
$749,450
$225,000
$349,000
$435,000
$215,000
$995,000
$346,900
$406,000
$250,000
$235,000
$529,900
$309,900
$619,000
$774,900
$349,900
$338,500
$575,000
$285,000
$250,000
$475,000