Movoto Real Estate
  • Exterior
  • View/Area
  • Living
  • Dining
  • Kitchen
  • Other
  • Bedroom
  • Bath
  • Animated home icon 3D tour
  • Video tour

33574 Washington Dr, Yucaipa, CA 92399

$990,000
•
  • 6

    bed

  • 4

    bath

  • 2,585

    Sqft ($383/Sqft)

Multi-family for sale 224 days
$50K price drop

About 33574 Washington Dr

Property type Multi-family
Neighborhood
Year built 1951
HOA fee $0/month
Lot size 2.5 Acre
Movoto estimate
Property description
Exceptional Bluff-Top Opportunity in Yucaipa – 2.5 Acres with Multiple Residences & Development Potential! Rare opportunity to own approximately 2.5 acres of prime view property perched on the bluff in the City of Yucaipa with stunning views, multiple residences, owned solar, and expansive land, this property presents a rare opportunity for investors, developers, or buyers seeking space, income potential, or multi-generational living, and long-term potential in one of Yucaipa’s most desirable bluff locations. This unique property features four doors (units) across three separate structures, per seller. Including a two-bedroom, one-bath main residence of approximately 1300 square feet, a two-bedroom, two-bath apartment, and two studio apartments, offering incredible versatility for multi-generational living, rental income, or future development potential. The main residence features a beautifully remodeled 2-bedroom, 1-bath turnkey home with beamed ceilings and an open-concept floor plan, creating a bright and inviting living space. The kitchen has been tastefully updated with granite and quartz countertops, complemented by new vinyl flooring throughout the structures. Additional highlights include a cozy fireplace, remodeled bath stainless steel appliances, kitchen island, large pantry, laundry closet, a bonus room/office with built-in desk and shelving, vinyl flooring throughout, and panoramic views. Enjoy beautiful sunsets and sunrise views from both the front and rear patios or the with a charming gazebo area perfect for relaxing or entertaining. The second detached building includes a beautifully remodeled 2-bedroom, 2-bath apartment, along with an attached studio unit featuring a kitchenette and private bathroom. Both units offer private patios, creating comfortable and private outdoor living spaces. A third detached conversion provides an additional studio, complete with a remodeled bathroom featuring a tile shower/tub combination, kitchenette, and its own private patio area. The property offers separate parking for each unit, along with a fully gated entrance for privacy and security. Residents also enjoy a communal in-ground pool that is fully gated, creating a shared recreational amenity. Additional property highlights include seller-owned solar systems, (Buyer to assume) on two of the residences, upgraded electrical service, and the convenience of being connected to city sewer. This property will not disappoint!
Listed by
Listing Agent - Holly Hastings
Listing Agent Contact: 909-797-1151
Listing Office - COLDWELL BANKER KIVETT-TEETERS
Source: CRMLS mls logo
MLS#IG26049739 • last updated 1 day ago
Movoto checked CRMLS for data 13 minutes ago
Request a virtual or in-person tour
Overview
Levels/Style One, Duplex
Type Residential
SubType Duplex
Virtual Tour External Link
Status Active
Living Area 2585
Lot Size (Acres) 2.5
Lot Size (SqFt) 108900
Year Built 1951
Condition Turnkey, Updated/Remodeled
Interior
Total # of Bathrooms 4
# Full Baths 4
Total # of Bedrooms 6
Eating Area Country Kitchen, Dining Room
Appliances Gas Cooktop, Water Heater, Disposal, Built-In Range, Gas Water Heater, Range Hood, Gas Range, Gas Oven, Dishwasher
Interior Features Beamed Ceilings, Quartz Counters, Ceiling Fan(s), Pantry, Recessed Lighting, Open Floorplan, Stone Counters
Accessibility Features 2+ Access Exits
Window Features Double Pane Windows, Wood Frames
Exterior
Foundation Raised, Slab
Construction Wood Siding, Stucco
Roof Composition
Parking Gated, On Site, Asphalt, Driveway, Parking Space
Other Structures Guest House, Guest House Detached, Shed(s), Gazebo, Outbuilding
Lot Description Ranch, Horse Property, Value In Land, Lawn, Near Public Transit, Gentle Sloping, Front Yard, Irregular Lot, Back Yard, Lot Over 40000 Sqft, Garden
Amenities / Utilities
Fireplaces Raised Hearth, Wood Burning, Family Room
Sewer/ Septic Public Sewer
Water Source Public
Electric Photovoltaics Seller Owned
Spa None
Location
View Bluff, Mountain(s), City Lights, Canyon, Valley
County San Bernardino
Community Features Foothills, Valley, Golf, Horse Trails, Hiking, Fishing, Storm Drains, Mountainous, Curbs, Lake, Biking, Park, Dog Park, Street Lights
High School Yucaipa, YUCAIP
High School District Yucaipa/Calimesa Unified
Directions You Can Enter Washington From Avenue E Or 7th S. Property Is On Bluff Side.
APN 318032140000
Lot/ Land Details
Road Frontage City Street
Road Surface Paved
Tour this home
When would you like to see 33574 Washington Dr?
question
Have a question about this property? Call us at (844) 430-0869
Source: GreatSchools.org © 2026. All rights reserved.

Around Central Yucaipa

Explore everything this neighborhood has to offer. Learn more about Central Yucaipa.
54/100
Walk
90/100
Family
38/100
Dining
76/100
Pet
  • Real Estate
  • CA
  • San Bernardino County
  • Yucaipa
  • 92399
  • Central Yucaipa
  • 33574 Washington Dr

My commute

Enter a destination to see travel time and distance.
By entering my info and clicking Ask a Question below, I am providing my e-signature and express written consent to receive marketing emails, calls, and texts (including via automatic telephone dialing systems, AI generative, artificial or pre-recorded voice technology) relating to my inquiry from Movoto (and parties calling/messaging on their behalf) even if my number appears on the company, state, or national Do Not Call Registry. You also agree to ourTerms and Conditions and Privacy Policy. Consent not required to receive services (call 1-844-420-1270 to be connected without providing consent).

Nearby homes for sale in Yucaipa, CA

Nearby recently sold homes in Yucaipa, CA

Newest listings in 92399

Meet with a real estate agent today (844) 430-0869
The multiple listing information is provided by CRMLS. IDX information is provided exclusively for consumers’ personal, non-commercial use and that it may not be used for any purpose other than to identify prospective properties consumers may be interested in purchasing. Information deemed reliable but not guaranteed to be accurate. Buyer to verify all information. The information provided is for consumers' personal, non-commercial use and may not be used for any purpose other than to identify prospective properties consumers may be interested in purchasing. Listing information updated every 15 minutes. Terms of use & Privacy Policy, California Privacy Info. Copyright © 2005 - 2026 Movoto, Inc. All rights reserved. Equal Housing Opportunity CalDRE CalDRE #01517281
Movoto Real Estate is committed to ensuring accessibility for individuals with disabilities. We are continuously working to improve the accessibility of our web experience for everyone. We welcome feedback and accommodation requests, please submit them here.
CRMLS Multiple Listing Service™ system
The real estate listing data marked with this icon comes from the IDX program of the CRMLS Multiple Listing Service™ system.
Based on information from California Regional Multiple Listing Service, Inc. as of 10/21/2026. This information is for your personal, non-commercial use and may not be used for any purpose other than to identify prospective properties you may be interested in purchasing. Display of MLS data is usually deemed reliable but is NOT guaranteed accurate by the MLS. Buyers are responsible for verifying the accuracy of all information and should investigate the data themselves or retain appropriate professionals. Information from sources other than the Listing Agent may have been included in the MLS data. Unless otherwise specified in writing, Broker/Agent has not and will not verify any information obtained from other sources. The Broker/Agent providing the information contained herein may or may not have been the Listing and/or Selling Agent.
Requests for information regarding mortgage products will be directed to Movoto.com affiliate, Lower, LLC - a licensed Mortgage Lender (NMLS #1124061), or, based on your location, may be redirected to a participating mortgage marketing partner that may pay Lower, LLC for any consumer contact information provided through this site.