Movoto Real Estate
Sold on 03/20/2026

3124 Clark St, Placerville, CA 95667

$570,000

Last sold 03/20/2026

  • 3

    bed

  • 2

    bath

  • 1,332

    Sqft ($428/Sqft)

House not for sale

About 3124 Clark St

Property type House
Year built 1980
HOA fee $0/month
Lot size 0.3 Acre
Movoto estimate
Parking 3 garage spaces
Property description
Beautifully remodeled in 2005, this inviting, super clean and move in ready 3 bedroom, 2 bath home offers 1,332 sq ft of bright, comfortable living space just minutes from historic downtown Placerville and directly across from Rotary Park complete with playground and Little League fields. Fresh interior paint! Very close to public transportation! Coming into the beautiful entrance the open, family-friendly floor plan features a bright living room with custom built-ins,a beautiful woodstove in the center and maple hard wood flooring. The light-filled kitchen is designed for gathering. Enjoy granite countertops, rich hickory cabinetry, a stylish backsplash, skylight, bar seating, breakfast/dining area and a downdraft electric cooktop (convertible to grill) perfect for busy weeknights or weekend get-togethers. A spacious loft adds flexible space for a kids' playroom, homework station, home office, or extra storage. The indoor laundry room with washer/dryer, sink and toilet adds everyday convenience for growing households. Plus there is room to add a fridge/freezer. The private, fenced backyard (frontyard is fenced as well)is ready for memory-making with a cozy fire pit,solid covered patio with sun shades, wood and storage shed. Durable Hardie Board cement siding, lifetime roof, Milgard windows, and RV/boat parking with full hookups offer both comfort and practicality. 2 garages and more parking in the back. A wonderful place to put down roots, play across the street, and enjoy the best of Placerville living. Perfect for first time home buyers!
Listed by
Listing Agent - Christiane H Berry
Listing Office - eXp Realty of California, Inc.
Source: Metrolist Services,Inc. mls logo
MLS#226018032 • last updated 6 months ago
Movoto checked Metrolist Services,Inc. for data 15 minutes ago
Overview
Cooling/AC Ceiling Fan(s), Central
Heating Central, Fireplace(s), Wood Stove
Levels/Style 0, Contemporary
Virtual Tour N/A
Type Residential
MLS # 226018032
Status Closed
SubType Single Family Residence
SqFt 1332
Lot Size (Sqft) 13068
Lot Size (Acres) 0.3
Year Built 1980
Property Condition Updated/Remodeled
Interior
Total # of Bathrooms 2
# of Full Baths 2
Total # of Bedrooms 3
Laundry Cabinets, Dryer Included, Sink, Electric, Washer Included, Inside Area, Inside Room
Flooring Carpet, Tile, Wood
Appliances Built-In Electric Range, Built-In Refrigerator, Dishwasher, Disposal, Microwave, Electric Cook Top, Electric Water Heater
Fireplace Living Room
Exterior
Foundation Concrete, Raised
Roof Shingle
Construction Ceiling Insulation, Cement Siding, Concrete, Floor Insulation, Frame, Glass, Wood, Lap Siding
Parking Attached, Boat Storage, RV Access, Detached, RV Storage, Guest Parking Available
# of Carport Spaces 1
Exterior Features Fire Pit
Patio/Porch Front Porch, Back Porch, Covered Patio
Lot Features Corner, Low Maintenance
Other Structures Shed(s), Storage
Fencing Back Yard, Front Yard
Irrigation Source Public District
Amenities / Utilities
Sewer/Septic Public Sewer
Water Source Public
Location
View City, Park
Elementary School District Placerville Union
Middle School District Placerville Union
High School District El Dorado Union High
Directions Highway 50, Turn Right On Spring, Left On Main, Turn Right On Pacific, right On Clark
APN 003-201-031-000
Multifamily Details
Lot/ Land Details
Topography Snow Line Below, Lot Grade Varies, Trees Few, Snow Line Below, Lot Grade Varies, Trees Few
$548K
Range: $493K-$602K
Last 30 days 
  • Mar 2026
    mls logo MLS # 226018032
  • Mar 20, 2026 Sold
    $570,000
  • Mar 4, 2026 Pending
    —
  • Feb 26, 2026 Listed
    $549,000
  • Mar 2026
    Public Records
  • Mar 18, 2026 Sold
    $570,000 (+3.8%)
  • Year Property taxes Tax assessment
  • 2025
    $1,204 +2.2%
    $117,655
  • 2024
    $1,178 +1.3%
    $117,655 +2.0%
  • 2023
    $1,163 +1.5%
    $115,349 +2.0%
  • 2022
    $1,146 +1.2%
    $113,088 +2.0%
  • 2021
    $1,132 +1.5%
    $110,872 +2.0%
  • 2020
    $1,115 +1.3%
    $108,699 +1.03%
  • 2019
    $1,100 +3.2%
    $107,586 +2.0%
  • 2018
    $1,066
    $105,478
  • 3124 Clark St
    $570K
  • —
  • 95667
    $575K -4% y/y
  • Placerville
    $575K -4% y/y
No chart available
Statistics calculated by Movoto
Est. value Bed/bath Sqft mi
3136 Clark St, Placerville, CA 95667 $483,000 3/2 1,380 0.02
3116 Clark St, Placerville, CA 95667 $381,000 2/1 1,210 0.02
3164 Goldner St, Placerville, CA 95667 $312,000 1/1 780 0.03
3142 Clark St, Placerville, CA 95667 $498,000 3/2 1,482 0.03
3169 Goldner St, Placerville, CA 95667 $331,000 1/1 816 0.03
3100 Clark St, Placerville, CA 95667 $469,000 3/2 1,316 0.04
3113 Clark St, Placerville, CA 95667 $214,000 3/1 1,213 0.04
3156 Goldner St, Placerville, CA 95667 $507,000 3/2 2,082 0.04

Estimated values are based on public record data and automated valuation models. Values are not guaranteed and may not reflect current market conditions.

Thinking of selling? Get a Cash Offer.

  • A smooth, fast sale
  • Skip staging and repairs
  • No strings attached
7/10
Source: GreatSchools.org © 2026. All rights reserved.

Around the neighborhood

Explore everything this neighborhood has to offer.
By entering my info and clicking Ask a Question below, I am providing my e-signature and express written consent to receive marketing emails, calls, and texts (including via automatic telephone dialing systems, AI generative, artificial or pre-recorded voice technology) relating to my inquiry from Movoto (and parties calling/messaging on their behalf) even if my number appears on the company, state, or national Do Not Call Registry. You also agree to ourTerms and Conditions and Privacy Policy. Consent not required to receive services (call 1-844-420-1270 to be connected without providing consent).

Nearby recently sold homes in Placerville, CA

Nearby homes for sale in Placerville, CA

Newest listings in 95667

  • Real Estate
  • CA
  • El Dorado County
  • Placerville
  • 95667
  • 3124 Clark St
Meet with a real estate agent today (844) 430-0869
The multiple listing information is provided by Metrolist Services, Inc. IDX information is provided exclusively for consumers’ personal, non-commercial use and that it may not be used for any purpose other than to identify prospective properties consumers may be interested in purchasing. Information deemed reliable but not guaranteed to be accurate. Buyer to verify all information. The information provided is for consumers' personal, non-commercial use and may not be used for any purpose other than to identify prospective properties consumers may be interested in purchasing. Listing information updated every 15 minutes. Terms of use & Privacy Policy, California Privacy Info. Copyright © 2005 - 2026 Movoto, Inc. All rights reserved. Equal Housing Opportunity CalDRE CalDRE #01517281
Movoto Real Estate is committed to ensuring accessibility for individuals with disabilities. We are continuously working to improve the accessibility of our web experience for everyone. We welcome feedback and accommodation requests, please submit them here.
Sacramento Metrolist Multiple Listing Service™ system
The real estate listing data marked with this icon comes from the IDX program of the Sacramento Metrolist Multiple Listing Service™ system. Information deemed reliable, but not verified or guaranteed. Users are responsible for checking the accuracy, completeness, currency, and status of all information. All measurements and all calculations of area (i.e., Sq Ft and Acreage) are approximate. Broker has represented to MetroList that Broker has a valid listing signed by seller authorizing placement in the MLS. Above information is provided by Seller and/or other sources and has not been verified by Broker. Some properties that appear for sale on this web site may subsequently have been sold and may no longer be available. Copyright 2026 MetroList Services, Inc. Metrolist Terms of Use
Requests for information regarding mortgage products will be directed to Movoto.com affiliate, Lower, LLC - a licensed Mortgage Lender (NMLS #1124061), or, based on your location, may be redirected to a participating mortgage marketing partner that may pay Lower, LLC for any consumer contact information provided through this site.