Movoto Real Estate
  • Exterior
  • Kitchen
  • Other
  • Entry Way
  • Bedroom
  • Bath
  • View/Area

521 NW 30th Ln, Lamar, MO 64759

$449,000
•
  • 6

    bed

  • 3

    bath

  • 2,700

    Sqft ($166/Sqft)

House for sale 64 days
$58K price drop

About 521 NW 30th Ln

Property type House
Neighborhood
Year built 1996
HOA fee $0/month
Lot size 7.5 Acre
Movoto estimate
Parking 1 garage spaces
Property description
This beautiful 3,918 square foot home with multiple outbuildings is a homesteader's dream come true. Located just a couple of miles off blacktop, this peaceful 7.5 +/-acres has everything you need for a successful homestead. The home has a large kitchen with custom Amish cabinets throughout and lots of counter space for prep work. A large cellar that is accessible from inside the house makes using and storing food easy regardless of the weather outside. The living area is open with great natural lighting, and lots of wood finishes make the space feel warm and inviting. The master bedroom and two full baths are located on the ground level. Upstairs, you will find 5 bedrooms with a full bath. A large 24’x50’ attached garage has an overhead door with plenty of room for storing vehicles, outdoor gear, ATVs, and processing food for storage. An insulated 16’x72’ metal building with concrete floors is currently being used for breeding dogs. With 10 indoor kennels along with a lean-to with outdoor runs, it's the perfect opportunity for an at-home business. A 24’x40’ insulated shop with an overhead door and concrete floors is more than enough room for repairs and storage of small farm equipment out of the weather. If you are a welder or woodworker, this would make a great workshop just a short distance from your front door. The large 54’x72’ barn with multiple stalls, a tack room, and an outdoor round pen makes this an ideal fit for anyone with livestock, especially horses.
Listed by
Listing Agent - Andy Unruh
Listing Office - Midwest Land Group
Source: Heartland MLS mls logo
MLS#2636618 • last updated 4 weeks ago
Movoto checked Heartland MLS for data 20 minutes ago
Request a virtual or in-person tour
Overview
Cooling/AC None
Heating Wood Stove
Levels/Style A-Frame, Traditional
MLS # 2636618
Type Residential
SubType Single Family Residence
Status Active
Living Area 2700
Lot Size (SqFt) 326700
Total Tax $ Amount 2347
Year Built 1996
HOA Fee $ None, 0
Interior
# Full Baths 3
# Bedrooms 6
Basement Cellar
Total # of Rooms 10
Dining Room Eat-In Kitchen
Laundry None
Flooring Luxury Vinyl, Other
Interior Features Custom Cabinets
Fireplace Gas
# Fireplaces 1
Exterior
Construction Board & Batten Siding
# Garage Spaces 1
Parking Desc Attached
Roof Composition
Other Structures Barn(s), Corral(s), Outbuilding, Shed(s), Stable(s)
Exterior Features Horse Facilities
Lot Desc Acreage
Patio/ Porch Patio
Amenities / Utilities
Sewer/ Septic Septic Tank
Water Source Rural
Location
Area 235 - Vernon, St Clair, Cedar, Barton And Dade
County Barton, MO
Subdivision None
High School District Liberal
Directions From DD HWY Take 30th Lane North For 2.2 Miles. Property Is On The West Side Of The Road.
Apn 309029000000004990
Lot/ Land Details
Lot Size 7.5
Road Responsibility Public Maintenance
Road Surface Gravel
Tour this home
When would you like to see 521 NW 30th Ln?
question
Have a question about this property? Call us at (844) 430-0869
N/A
N/A
4/10
Source: GreatSchools.org © 2026. All rights reserved.

Around 235 - Vernon, St Clair, Cedar, Barton And Dade

Explore everything this neighborhood has to offer.
0/100
Walk
87/100
Family
1/100
Dining
58/100
Pet
  • Real Estate
  • MO
  • Barton County
  • Lamar
  • 64759
  • 521 NW 30th Ln

My commute

Enter a destination to see travel time and distance.
By entering my info and clicking Ask a Question below, I am providing my e-signature and express written consent to receive marketing emails, calls, and texts (including via automatic telephone dialing systems, AI generative, artificial or pre-recorded voice technology) relating to my inquiry from Movoto (and parties calling/messaging on their behalf) even if my number appears on the company, state, or national Do Not Call Registry. You also agree to ourTerms and Conditions and Privacy Policy. Consent not required to receive services (call 1-844-420-1270 to be connected without providing consent).

Nearby homes for sale in Lamar, MO

Nearby recently sold homes in Lamar, MO

Meet with a real estate agent today (844) 430-0869
The multiple listing information is provided by Heartland MLS . IDX information is provided exclusively for consumers’ personal, non-commercial use and that it may not be used for any purpose other than to identify prospective properties consumers may be interested in purchasing. Information deemed reliable but not guaranteed to be accurate. Buyer to verify all information. The information provided is for consumers' personal, non-commercial use and may not be used for any purpose other than to identify prospective properties consumers may be interested in purchasing. Listing information updated every 15 minutes. Terms of use & Privacy Policy, California Privacy Info. Copyright © 2005 - 2026 Movoto, Inc. All rights reserved. Equal Housing Opportunity CalDRE CalDRE #01517281
Movoto Real Estate is committed to ensuring accessibility for individuals with disabilities. We are continuously working to improve the accessibility of our web experience for everyone. We welcome feedback and accommodation requests, please submit them here.
Heartland Multiple Listing Service™ system
The information displayed on this page is confidential, proprietary, and copyrighted information of Heartland Multiple Listing Service, Inc. ("Heartland MLS"). ©2026. , Heartland MultipleListing Service, Inc. Heartland MLS and Movoto LLC. do not make any warranty or representation concerning the timeliness or accuracy of the information displayed herein. In consideration for the receipt of the information on this page, the recipient agrees to use the information solely for the private noncommercial purpose of identifying a property in which the recipient has a good faith interest in acquiring. Heartland MLS Terms of Use
Requests for information regarding mortgage products will be directed to Movoto.com affiliate, Lower, LLC - a licensed Mortgage Lender (NMLS #1124061), or, based on your location, may be redirected to a participating mortgage marketing partner that may pay Lower, LLC for any consumer contact information provided through this site.