Movoto Real Estate

2333 Junction Dr, Celina, TX 75009

$801,900
•
  • 5

    bed

  • 5

    bath

  • 3,794

    Sqft ($211/Sqft)

House pending

About 2333 Junction Dr

Property type House
Neighborhood
Year built 2026
HOA fee $188/month
Lot size 8,128 Sqft
Movoto estimate
Parking 3 garage spaces
Property description
Two-story entry features curved staircase. Formal dining room and home office with French doors frame entry. Two-story family room with wood mantel fireplace and wall of windows opens to kitchen and morning area. Kitchen features 5-burner gas cooktop, double wall oven, walk-in pantry, butler's pantry and island with built-in seating space. First-floor primary suite includes bedroom with 12-foot ceiling and wall of windows. Dual vanities, freestanding tub, separate glass-enclosed shower and two walk-in closets in primary bath. A second bedroom is downstairs. A game room, theatre room, Hollywood bathroom and secondary bedrooms are upstairs. Extended covered backyard patio. Mud room off three-car garage.
Listed by
Listing Agent - Lee Jones
Listing Agent Contact: 713-948-6666
Listing Office - Perry Homes Realty LLC
Source: NTREIS mls logo
MLS#21314970 • last updated 3 weeks ago
Movoto checked NTREIS for data 7 minutes ago
Request a virtual or in-person tour
Overview
Cooling/AC CeilingFans, Zoned
Levels/Style Two, House
SubType Single Family Residence
Virtual Tour External Link
MLS # 21314970
Status Pending
SqFt 3794
Lot Size (SqFt) 8128.3
Lot Size (Acres) 0.1866
Year Built 2026
HOA Fee Annually, 2250
HOA Ramble HOA
Interior
# Full Baths 4
Total # of Bathrooms 5
# Half Baths 1
Total # of Bedrooms 5
Appliances DoubleOven, Dishwasher, Disposal, GasRange, GasWaterHeater, Microwave, TanklessWaterHeater
Exterior
Roof Composition
Construction Brick
Foundation Slab
# Covered Spaces 3
# Garage Spaces 3
Patio/ Porch Covered
Amenities / Utilities
Green Features Ventilation, Low-Flow Fixtures
Pool None
Location
Subdivision Ramble
County Collin
Elementary School Bobby Ray-Afton Martin
Middle School Jerry & Linda Moore
High School Celina
Elementary School District Celina ISD
High School District Celina ISD
Directions From Dallas North Tollway, Go North And Continue Onto Dallas Pkwy. Turn Right Onto W Outer Loop, Left Onto Preston Rd. Continue, Turn Right Onto Ramble Way Then Straight Through The Roundabout, Left On Wisteria Lane, Right On Frontcountry Ln. The Model Home Is On Your Right At 1412 Frontcountry Ln.
APN 2975715
Lot/ Land Details
Road Surface Dirt
Tour this home
When would you like to see 2333 Junction Dr?
question
Have a question about this property? Call us at (844) 430-0869
N/A
6/10
Source: GreatSchools.org © 2026. All rights reserved.

Around Ramble

Explore everything this neighborhood has to offer.
  • Real Estate
  • TX
  • Collin County
  • Celina
  • 75009
  • 2333 Junction Dr

My commute

Enter a destination to see travel time and distance.
By entering my info and clicking Ask a Question below, I am providing my e-signature and express written consent to receive marketing emails, calls, and texts (including via automatic telephone dialing systems, AI generative, artificial or pre-recorded voice technology) relating to my inquiry from Movoto (and parties calling/messaging on their behalf) even if my number appears on the company, state, or national Do Not Call Registry. You also agree to ourTerms and Conditions and Privacy Policy. Consent not required to receive services (call 1-844-420-1270 to be connected without providing consent).

Nearby homes for sale in Celina, TX

Nearby recently sold homes in Celina, TX

Newest listings in 75009

Meet with a real estate agent today (844) 430-0869
The multiple listing information is provided by North Texas Real Estate Information Systems, Inc.. IDX information is provided exclusively for consumers’ personal, non-commercial use and that it may not be used for any purpose other than to identify prospective properties consumers may be interested in purchasing. Information deemed reliable but not guaranteed to be accurate. Buyer to verify all information. The information provided is for consumers' personal, non-commercial use and may not be used for any purpose other than to identify prospective properties consumers may be interested in purchasing. Listing information updated every 15 minutes. Terms of use & Privacy Policy, California Privacy Info. Copyright © 2005 - 2026 Movoto, Inc. All rights reserved. Equal Housing Opportunity CalDRE CalDRE #01517281
Movoto Real Estate is committed to ensuring accessibility for individuals with disabilities. We are continuously working to improve the accessibility of our web experience for everyone. We welcome feedback and accommodation requests, please submit them here.
The database information herein is provided from and copyrighted by the North Texas Real Estate Information Systems, Inc. NTREIS data may not be reproduced or redistributed and is only for people viewing this site. All information provided is deemed reliable but is not guaranteed and should be independently verified. The advertisements herein are merely indications to bid and are not offers to sell which may be accepted. All properties are subject to prior sale or withdrawal. ©2026 North Texas Real Estate Information Systems, Inc. All rights reserved.
Requests for information regarding mortgage products will be directed to Movoto.com affiliate, Lower, LLC - a licensed Mortgage Lender (NMLS #1124061), or, based on your location, may be redirected to a participating mortgage marketing partner that may pay Lower, LLC for any consumer contact information provided through this site.