Movoto Real Estate
  • Exterior
  • Other
  • Living
  • Entry Way
  • Bedroom
  • Bath
  • View/Area
  • Floorplan
  • Animated home icon 3D tour

26450 Eaglepoint Road Apt Rd #(70' LAKEFRONT), Barnett, MO 65011

$774,999
•
  • 3

    bed

  • 3

    bath

  • 2,068

    Sqft ($375/Sqft)

House for sale 489 days
$45K price drop

About 26450 Eaglepoint Road Apt Rd #(70' LAKEFRONT)

Property type House
Year built 2024
HOA fee $23/month
Lot size 1.2 Acre
Movoto estimate
Parking 2 garage spaces
Property description
Spacious 1.20 acres/80' of lakefront in a reg no wake cove. Main level living, Main BR patio is wired for a hot tub. Main BA, enjoy custom walk-in shower, bidet, huge 10'x15' walk-in closet. Ceiling fans though out! A gourmet kitchen, with quartz counter tops, walk-in pantry. Laundry mud rm., equip. to bathe pets-wash-up those kiddoes after playing outdoors! Extra storage/closet space & area above drop ceiling in 2.5 car garage area (732 sq. ft.) in addition to the fin. sq. ft. Parking avail for 15+ vehicles, RV 110 electrical hookup. Garage has a mini splitter Heater/AC adding comfort during projects! Sellers offering $30,000. credit allowance toward pro landscaping and boat dock. Tax bill is from a larger parcel, therefore tax bill is to be determined. Property lines are approximate; are for illustration purposes only; Additional shoreline avail. for X $’s see MLS#3576825. Full time occupied; scheduled appointment a 4-hour notice to see. Please' No drive by (private rd.). Cameras-video in use. Trustee for the trust is a licensed real estate agent. Some images are AI Enhanced and staged. Not being used as a rental.
Listed by
Listing Agent - ANNA FUCHS
Listing Agent Contact: (573) 348-9898
Listing Office - Keller Williams L.O. Realty
Source: Bagnell Dam AOR mls logo
MLS#3576477 • last updated 2 months ago
Movoto checked Bagnell Dam AOR for data 1 hour ago
Request a virtual or in-person tour
Overview
Cooling/AC CentralAir, Other
Heating Electric, ForcedAir, Other
Levels/Style One, 1, One Story
Virtual Tour External Link
MLS # 3576477
Living Area 2068
SubType Detached
Type Residential
Status Active
Lot Size (Acres) 1.2
Property Tax 2400.88
Year Built 2024
HOA Fee Annually, 275
Interior
Total # of Bathrooms 3
# Full Bath 3
# Bedrooms 3
Basement None
Total # of Rooms 12
Laundry WasherHookup, DryerHookup
Flooring LuxuryVinylPlank, Tile
Accessibility Features Low Threshold Shower
Appliances Dishwasher, Disposal, Microwave, Range, Refrigerator, WaterSoftenerOwned, Stove
Interior Features Bidet, CeilingFans, Pantry, CableTv, WalkInClosets, WalkInShower
Fireplace None
Exterior
Foundation Poured, Slab
Roof Metal
Construction Metal Siding
Parking Desc Attached, Drain, Electricity, Garage, GarageDoorOpener, HeatedGarage, InsulatedGarage, Open, Other, RvHookUps
# Garage Spaces 2
Exterior Features GravelDriveway, Porch, Storage
Patio/ Porch Porch
Lot Desc Acreage, GentleSloping, LakeFront, Level, OpenLot, Sloped, Views, Wooded
Lot Size Dimensions IRR-TBD
Amenities / Utilities
Sewer/ Septic Septic Tank
Water Source Private, Well
HOA Fee Includes Road Maintenance
Location
County Morgan
Waterfront Cove, LakeFront
Community Features None
Subdivision None
Elem School District Eldon
Middle School District Eldon
High School District Eldon
APN 156024200001003008
Zoning None
Directions W, To Golden Beach (Lake Rd., W3), 6 Miles, Left On Sara's Rd., Stay To The Right On Blacktop Then It Turns To Gravel. Go Approximately 1/2 +/-, On The Right. Please No Drive By. Fulltime Occupied. Video, Security And Camera's In Use On The Property.
Lot/ Land Details
Add'l Parcels Desc Tax Bill Includes A Larger Parcel Therefore Tax Bill To Be Determined.
Possible Use Residential
Road Responsibility Road Maintenance Agreement
Road Surface Gravel
Tour this home
When would you like to see 26450 Eaglepoint Road Apt Rd #(70' LAKEFRONT)?
question
Have a question about this property? Call us at (844) 430-0869
N/A
7/10
7/10
8/10
N/A
Source: GreatSchools.org © 2026. All rights reserved.

Around the neighborhood

Explore everything this neighborhood has to offer.
  • Real Estate
  • MO
  • Morgan County
  • Barnett
  • 65011
  • 26450 Eaglepoint Road Apt Rd #(70' LAKEFRONT)

My commute

Enter a destination to see travel time and distance.
By entering my info and clicking Ask a Question, I am providing my e-signature and express written consent to receive marketing emails, calls, and texts (including via automatic telephone dialing systems, AI generative, artificial or pre-recorded voice technology) relating to my inquiry from Movoto (and parties calling/messaging on their behalf) even if my number appears on the company, state, or national Do Not Call Registry. You also agree to ourTerms and Conditions and Privacy Policy. Consent not required to receive services (call 1-844-420-1270 to be connected without providing consent).

Nearby homes for sale in Barnett, MO

Nearby recently sold homes in Barnett, MO

Newest listings in 65011

Meet with a real estate agent today (844) 430-0869
The multiple listing information is provided by Bagnell Dam AOR. IDX information is provided exclusively for consumers’ personal, non-commercial use and that it may not be used for any purpose other than to identify prospective properties consumers may be interested in purchasing. Information deemed reliable but not guaranteed to be accurate. Buyer to verify all information. The information provided is for consumers' personal, non-commercial use and may not be used for any purpose other than to identify prospective properties consumers may be interested in purchasing. Listing information updated every 15 minutes. Terms of use & Privacy Policy, California Privacy Info. Copyright © 2005 - 2026 Movoto, Inc. All rights reserved. Equal Housing Opportunity CalDRE CalDRE #01517281
Movoto Real Estate is committed to ensuring accessibility for individuals with disabilities. We are continuously working to improve the accessibility of our web experience for everyone. We welcome feedback and accommodation requests, please submit them here.
By searching you agree to the following statements. The data relating to real estate for sale on this website comes in part courtesy of the Broker Reciprocity Internet Data Exchange Program of the Multiple Listing Service of Lake of the Ozarks Board of REALTORS® Inc. Real estate listings are governed by MLS Rules and Regulations and detailed information about them includes the name of the listing companies.

Listing Information Copyright 2026 Multiple Listing Service of Lake of the Ozarks Board of REALTORS®, Inc.

Information herein is believed to be accurate and timely, but no warranty as such is expressed or implied. The information being provided is for consumers’ personal, non-commercial use and will not be used for any purpose other than to identify prospective properties consumers may be interested in purchasing.
Requests for information regarding mortgage products will be directed to Movoto.com affiliate, Lower, LLC - a licensed Mortgage Lender (NMLS #1124061), or, based on your location, may be redirected to a participating mortgage marketing partner that may pay Lower, LLC for any consumer contact information provided through this site.