Movoto Real Estate
Sold on 04/30/2025

17025 Lake Arthur Rd, Applegate, CA 95703

$551,500

Last sold 04/30/2025 for $540K

  • 4

    bed

  • 2

    bath

  • 1,955

    Sqft ($276/Sqft)

House not for sale

About 17025 Lake Arthur Rd

Property type House
Year built 1674
HOA fee $0/month
Lot size 3.06 Acre
Movoto estimate
Parking 2 garage spaces
Property description
Enjoy the farm house lifestyle with the comforts of a modern home, plus ADU, barn, huge workshop, garden shed, 2 large storage sheds and a concrete bunker! This homestead sits on 3 acres, nestled into the hillside just below the snow line. The main house features a brand new kitchen with natural wood cabinets, granite countertops & island bar. Lots of storage and stainless steel appliances. Luxury Vinyl Flooring though out and a mix of painted walls and paneled ceilings create a sense of nostalgia for a time gone by. Both bathrooms are brand new, as well as most windows. Upgraded tankless hot water heater and multi-zone heating & cooling Units (55K BTUs)add comfort and dependability to this classic home. The detached ADU features 1 bed 1 bath , a full kitchen and cozy living room, quartz counters, new cabinets, LVP flooring, and cedar lined closet. Separate Propane tank. Built in Rental Income! Loads of storage, and lots of fruit trees make living here a breeze. A large portion of the property is unused and perhaps could be split, up the hill you will find a sturdy barn and a massive workshop. (more ADU's?)There are lots of possibilities for your family and friends in this place. NID water flows along the North and East boundary lines. Get away to your own estate!
Listed by
Listing Agent - Barry V Mathis
Listing Office - eXp Realty of California Inc
Source: Metrolist Services,Inc. mls logo
MLS#225003414 • last updated 1 year ago
Movoto checked Metrolist Services,Inc. for data 8 minutes ago
Overview
Cooling/AC Ductless, MultiUnits, MultiZone
Heating Ductless, MultiUnits, MultiZone
Levels/Style 0, Two, Ranch, Cottage, Craftsman, Farmhouse
Type Residential
MLS # 225003414
Status Closed
SubType Single Family Residence
SqFt 1955
Lot Size (Sqft) 133294
Lot Size (Acres) 3.06
Year Built 1674
Property Condition Updated/Remodeled
Interior
Total # of Bathrooms 2
# of Full Baths 2
Total # of Bedrooms 4
Laundry Sink, Inside Room
Flooring Simulated Wood, Vinyl
Appliances Free Standing Gas Oven, Free Standing Gas Range, Free Standing Refrigerator, Gas Water Heater, Dishwasher, Disposal, Microwave, Tankless Water Heater
Exterior
Foundation Raised
Roof Composition
Construction Stucco, Lap Siding, Wood Siding
Parking 24'+ Deep Garage, RV Storage, Garage Facing Front, Uncovered Parking Spaces 2+, Guest Parking Available, See Remarks
Exterior Features Dog Run, Fire Pit
Patio/Porch Front Porch, Back Porch
Lot Features Meadow West, Shape Regular
Other Structures Barn(s), Shed(s), Storage, Guest House, Workshop
Fencing Back Yard, Partial, Wire, Fenced, Wood
Irrigation Source Irrigation Available
Amenities / Utilities
Sewer/Septic Septic System
Water Source Well
Horse Amenities 1-6 Stalls, Pasture, Barn(s), Fenced
Location
View Pasture, Hills, Woods
Elementary School District Placer Hills Union
Middle School District Placer Hills Union
High School District Placer Union High
Directions From I-80 E, Take Exit 125 Toward Meadow Vis/Clipper Gap. Turn Left Onto Placer Hills Rd. Turn Right Onto Lake Arthur Rd. Destination Will Be On The Left
APN 073-130-029-000
Multifamily Details
Lot/ Land Details
Road Responsibility Public Maintained Road
Topography Hillside, Snow Line Below, Lot Grade Varies, Lot Sloped, Hillside, Snow Line Below, Lot Grade Varies, Lot Sloped
Road Surface Asphalt
$551K
Range: $487K-$615K
Last 30 days 
  • Apr 2025
    mls logo MLS # 225003414
  • Apr 30, 2025 Sold
    $540,000
  • Mar 22, 2025 Pending
    —
  • Mar 8, 2025 Price Change
    $584,777
  • Feb 28, 2025 Price Change
    $584,877 (-2.5%)
  • Feb 12, 2025 Price Change
    $599,897 (-4.0%)
  • Feb 3, 2025 Price Change
    $624,988 (-3.8%)
  • Jan 24, 2025 Price Change
    $649,999 (-4.3%)
  • Jan 10, 2025 Listed
    $679,000 (+122.6%)
  • Apr 2025
    Public Records
  • Apr 29, 2025 Sold
    $540,000 (-7.7%)
  • Jan 2024
    Public Records
  • Jan 19, 2024 Sold
    $305,000
  • Jan 2024
    mls logo MLS # 223113460
  • Jan 19, 2024 Sold
    $305,000 (-32.2%)
  • Jan 10, 2024 Pending
    —
  • Dec 11, 2023 Pending Bring Backup
    —
  • Dec 7, 2023 Listed
    $449,999
  • Year Property taxes Tax assessment
  • 2025
    $3,675 +1.7%
    $311,100 +2.0%
  • 2024
    $3,612 -26.7%
    $305,000 -29.34%
  • 2023
    $4,930 +326.8%
    $431,664
  • 2022
    $1,155 +3.4%
    $431,664 +658.57%
  • 2021
    $1,117 +2.3%
    $56,905 +1.04%
  • 2020
    $1,092 +28.8%
    $56,322 +2.0%
  • 2018
    $848
    $55,218
  • 17025 Lake Arthur Rd
    $540K
  • —
  • 95703
    $649K +66% y/y
  • Applegate
    $649K +25% y/y
No chart available
Statistics calculated by Movoto
Est. value Bed/bath Sqft mi
16991 Lake Arthur Rd, Applegate, CA 95703 $404,500 3/1 1,363 0.07
75 Pinecrest Dr, Applegate, CA 95703 $508,500 4/2 1,680 0.08
47 Pinecrest Dr, Applegate, CA 95703 $455,400 3/2 1,512 0.09
100 Gilbert Dr, Applegate, CA 95703 $688,800 2/2 1,729 0.09
16935 Lake Arthur Rd, Applegate, CA 95703 $405,300 2/1 1,164 0.09
57 Pinecrest Dr, Applegate, CA 95703 $524,800 3/1 1,662 0.1
17050 Applegate Rd, Applegate, CA 95703 $464,300 3/2 1,604 0.11
16917 Lake Arthur Rd, Applegate, CA 95703 $417,600 2/1 1,343 0.11

Estimated values are based on public record data and automated valuation models. Values are not guaranteed and may not reflect current market conditions.

Thinking of selling? Get a Cash Offer.

  • A smooth, fast sale
  • Skip staging and repairs
  • No strings attached
6/10
9/10
Source: GreatSchools.org © 2026. All rights reserved.

Around the neighborhood

Explore everything this neighborhood has to offer.
By entering my info and clicking Ask a Question, I am providing my e-signature and express written consent to receive marketing emails, calls, and texts (including via automatic telephone dialing systems, AI generative, artificial or pre-recorded voice technology) relating to my inquiry from Movoto (and parties calling/messaging on their behalf) even if my number appears on the company, state, or national Do Not Call Registry. You also agree to ourTerms and Conditions and Privacy Policy. Consent not required to receive services (call 1-844-420-1270 to be connected without providing consent).

Nearby recently sold homes in Applegate, CA

Nearby homes for sale in Applegate, CA

Newest listings in 95703

  • Real Estate
  • CA
  • Placer County
  • Applegate
  • 95703
  • 17025 Lake Arthur Rd
Meet with a real estate agent today (844) 430-0869
The multiple listing information is provided by Metrolist Services, Inc. IDX information is provided exclusively for consumers’ personal, non-commercial use and that it may not be used for any purpose other than to identify prospective properties consumers may be interested in purchasing. Information deemed reliable but not guaranteed to be accurate. Buyer to verify all information. The information provided is for consumers' personal, non-commercial use and may not be used for any purpose other than to identify prospective properties consumers may be interested in purchasing. Listing information updated every 15 minutes. Terms of use & Privacy Policy, California Privacy Info. Copyright © 2005 - 2026 Movoto, Inc. All rights reserved. Equal Housing Opportunity CalDRE CalDRE #01517281
Movoto Real Estate is committed to ensuring accessibility for individuals with disabilities. We are continuously working to improve the accessibility of our web experience for everyone. We welcome feedback and accommodation requests, please submit them here.
Sacramento Metrolist Multiple Listing Service™ system
The real estate listing data marked with this icon comes from the IDX program of the Sacramento Metrolist Multiple Listing Service™ system. Information deemed reliable, but not verified or guaranteed. Users are responsible for checking the accuracy, completeness, currency, and status of all information. All measurements and all calculations of area (i.e., Sq Ft and Acreage) are approximate. Broker has represented to MetroList that Broker has a valid listing signed by seller authorizing placement in the MLS. Above information is provided by Seller and/or other sources and has not been verified by Broker. Some properties that appear for sale on this web site may subsequently have been sold and may no longer be available. Copyright 2026 MetroList Services, Inc. Metrolist Terms of Use
Requests for information regarding mortgage products will be directed to Movoto.com affiliate, Lower, LLC - a licensed Mortgage Lender (NMLS #1124061), or, based on your location, may be redirected to a participating mortgage marketing partner that may pay Lower, LLC for any consumer contact information provided through this site.